Identification of construction risk techniques: A review

Marwa Makki Dishar Department of Civil Engineering, College of Engineering, University of Baghdad, Baghdad, Iraq
Ahlam A. Abbood Department of Civil Engineering, College of Engineering, University of Baghdad, Baghdad, Iraq
Raghad Sameer Mahmood Department of Civil Engineering, College of Engineering, University of Baghdad, Baghdad, Iraq

Published 2025-06-30

Keywords

  • Array,
  • Array,
  • Array,
  • Array

How to Cite

Identification of construction risk techniques: A review. (2025). Samarra Journal of Engineering Science and Research, 3(2), 24-40. https://doi.org/10.65115/21kw9471

Abstract

The construction project consists of multiple stages, independent and overlapping events and activities, and includes various parties, including decision-makers, consultants, owners, and project implementers. Completing a construction project is a difficult and complex process that is hardly devoid of problems or obstacles. The presence of risks, which may be either beneficial or detrimental, is one such impediment. Negative risks, uncertainty is the beginning of the emergence of risks, which have effects and consequences that prevent the achievement of project objectives. Therefore, the success of the project is guaranteed if the risks are identified from the beginning of the project., to complete a project or even a building project. This article aims to focus on the concept of risk management in general, the extent of its emphasis, and how to apply it to projects. Specifically, the initial stage of risk management, called risk identification, was reviewed. Ninety-one studies were reviewed between 1990 and 2023, demonstrating the importance of identifying risks, which helps stakeholders manage the project using modern management methods.

Downloads

Download data is not yet available.

References

  1. [1] B.-G. Hwang, X. Zhao, and M. J. S. Gay, "Public private partnership projects in Singapore: Factors, critical risks and preferred risk allocation from the perspective of contractors," International Journal of Project Management, vol. 31, no. 3, pp. 424-433, 2013.
  2. [2] C. Ubani, B. Amade, K. A. Okorocha, F. Agwu, and F. Okogbuo, "Project risk management issues in the Nigerian construction industry," International Journal of Engineering and Technical Research, vol. 3, no. 1, pp. 217-232, 2015.
  3. [3] P. Kishan, R. Bhatt, and J. Bhavsar, "A study of risk factors affecting building construction projects," International Journal of Engineering Research & Technology, vol. 3, no. 12, pp. 831-835, 2014.
  4. [4] A. Serpell, X. Ferrada, L. Rubio, and S. Arauzo, "Evaluating risk management practices in construction organizations," Procedia-Social and Behavioral Sciences, vol. 194, pp. 201-210, 2015.
  5. [5] M. Nabawy, G. Ofori, M. Morcos, and C. Egbu, "Risk identification framework in construction of Egyptian mega housing projects," Ain Shams Engineering Journal, vol. 12, no. 2, pp. 2047-2056, 2021.
  6. [6] S. M. El-Sayegh, "Risk assessment and allocation in the UAE construction industry," International Journal of Project Management, vol. 26, no. 4, pp. 431-438, 2008
  7. [7] D. Bajaj, J. Oluwoye, and D. Lenard, "An analysis of contractors' approaches to risk identification in New South Wales, Australia," Construction Management and Economics, vol. 15, no. 4, pp. 363-369, 1997.
  8. [8] M. Leo, S. Sharma, and K. Maddulety, "Machine Learning in Banking Risk Management: A Literature Review," Risks, vol. 7, no. 1, p. 29, 2019.
  9. [9] A. M. Keshk, I. Maarouf, and Y. Annany, "Special studies in management of construction project risks, risk concept, plan building, risk quantitative and qualitative analysis, risk response strategies," Alexandria Engineering Journal, vol. 57, no. 4, pp. 3179-3187, 2018.
  10. [10] B. Gharanfoli and C. Valmohammadi, "Identification and prioritization of construction projects investment risks using a hybrid fuzzy approach," Journal of Multi-Criteria Decision Analysis, vol. 26, no. 3-4, pp. 113-127, 2019.
  11. [11] O. O. Odimabo, C. F. Oduoza, and S. Suresh, "Critical risk factors affecting building construction project. In Nigeria—An empirical study," in Proceedings from the 25th International Conference on Flexible Automation and Intelligent Manufacturing (FAIM), Wolverhampton, UK, 2015.
  12. [12] K. de Bakker, A. Boonstra, and H. Wortmann, "Risk Management Affecting IS/IT Project Success through Communicative Action," Project Management Journal, vol. 42, no. 3, pp. 75-90, 2011.
  13. [13] L. P. Dana, H. T. Nguyen, and B. R. Kuc, "Strategic outsourcing risk management of Van Hien University in Vietnam," International Journal of Advanced Multidisciplinary Research and Studies, vol. 1, no. 2, pp. 1-6, 2021.
  14. [14] A. M. Abdulmoneim, A. Al Samadony, and I. A. Nosair, "Identification and Ranking the Most Significant Risks of the Mega Construction Projects in Saudi Arabia," Saudi Journal of Civil Engineering, vol. 5, no. 2, pp. 35-49, 2021.
  15. [15] Q. Zhu, L. Liu, and Y. He, "Application of Process Analysis based on Value Objective Improvement in Risk Identification of Supply Chain," in 2019 Chinese Automation Congress (CAC), Hangzhou, China, 2019: IEEE, pp. 4213-4218.
  16. [16] S. M. H. Mojtahedi, S. M. Mousavi, and A. Makoui, "Risk identification and analysis concurrently: Group Decision Making afpproach," in 2008 4th IEEE International Conference on Management of Innovation and Technology, Bangkok, Thailand, 2008: IEEE, pp. 299-304.
  17. [17] J. T. Marchewka, "Managing Project Risk," in Information Technology Project Management: John Wiley & Sons, Inc., 2003, pp. 166-196.
  18. [18] N. J. Smith, T. Merna, and P. Jobling, Managing risk in construction projects. John Wiley & Sons, 2014.
  19. [19] P. Bower, "Risk Management Options," ProjectSmart, 2024. [Online]. Available: https://www.projectsmart.co.uk/risk-management/risk-management-options.php
  20. [20] H. Tohidi, "The Role of Risk Management in IT systems of organizations," Procedia Computer Science, vol. 3, pp. 881-887, 2011.
  21. [21] C. S. Goh, H. Abdul-Rahman, and Z. Abdul Samad, "Applying risk management workshop for a public construction project: Case study," Journal of Construction Engineering and Management, vol. 139, no. 5, pp. 572-580, 2013.
  22. [22] N. H. Kadum, "The integration of Risk management and BIM to Manage the duration of construction projects," Ph.D. Dissertation, University of Diyala, Diyala, Iraq, 2021.
  23. [23] Y. S. Nassar, "Explore and assess the risks of the project parties involved in the construction projects," Journal of Global Scientific Research, vol. 6, no. 12, pp. 1906-1919, 2021.
  24. [24] H. Fukuda and H. Kuwano, "The Mathematical Model of Project Risk Responses in Project Risk Management," Journal of the Operations Research Society of Japan, vol. 60, no. 2, pp. 192-200, 2017.
  25. [25] E. K. Rasheed, "Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq," Journal of Engineering, vol. 21, no. 4, pp. 1-19, 2015.
  26. [26] M. M. Dishar and M. R. Altaie, "Diagnosis of risk factors that lead to serious casualties in the road construction projects in Iraq," IOP Conference Series: Earth and Environmental Science, vol. 1374, p. 012039, 2024.
  27. [27] N. Banaitiene and A. Banaitis, "Risk management in construction projects," in Risk management-current issues and challenges: BoD, 2012, pp. 429-448.
  28. [28] H. O. Ghaeb and A. M. R. Mahjoob, "Risk response in construction project: a review Study," Journal of Engineering, vol. 29, no. 08, pp. 121-137, 2023.
  29. [29] D. F. Cooper, Project Risk management guidelines managing risk in large projects and complex procurements. John Wiley & Sons Inc., 2004.
  30. [30] M. M. Dishar and M. R. Altaie, "Identify the Critical Risk Factors at the Tendering Phase in Iraq," in Current Trends in Geotechnical Engineering and Construction, 2022: Springer, pp. 113-123.
  31. [31] H. I. Naji and R. H. Ali, "Risk response selection in construction projects," Civil Engineering Journal, vol. 3, no. 12, pp. 1208-1221, 2017.
  32. [32] W. Bransah, "Discovering project risk management practices in construction industry of Ghana," Dama Academic Scholarly Journal of Researchers, vol. 5, no. 3, pp. 1-14, 2020.
  33. [33] G. T. Luka and Y. Ibrahim, "Identification and assessment of key risk factors affecting public construction projects in Nigeria: Stakeholders perspectives," in The Nigerian Institute of Quantity Surveyors: 2nd Research Conference–ReCon2, 2015, p. 706.
  34. [34] N. Ehsan, E. Mirza, M. Alam, and A. Ishaque, "Notice of Retraction: Risk management in construction industry," in 2010 3rd International Conference on Computer Science and Information Technology, Chengdu, China, 2010: IEEE, pp. 16-21.
  35. [35] K. Kapustka, D. Klimecka-Tatar, and G. Ziegmann, "The management and potential risk reduction in the processing of rare earths elements," System Safety: Human-Technical Facility-Environment, vol. 1, no. 1, pp. 77-84, 2019.
  36. [36] C. Chapman and S. Ward, Project risk management: Processes, techniques and insights. Wiley, 1997.
  37. [37] D. Baloi and A. D. Price, "Modelling global risk factors affecting construction cost performance," International Journal of Project Management, vol. 21, no. 4, pp. 261-269, 2003.
  38. [38] E. W. L. a. C. F. Gray, Project Management: The Managerial Process. McGraw-Hill Hills Companies, Inc., New York, 2011.
  39. [39] H. F. Al-Ajmi and E. Makinde, "Risk management in construction projects," Journal of Advanced Management Science, vol. 6, no. 2, pp. 113-116, 2018.
  40. [40] E. K. Al-Geelawee and A. N. Mohammed, "Application of total quality management (TQM) requirements in risk management in construction projects in Iraq," Journal of Engineering, vol. 22, no. 6, pp. 1-15, 2016.
  41. [41] Project Management Institute, "Project Management," 2022. [Online]. Available: https://www.pmi.org/about/what-is-project-management
  42. [42] P. K. Dey, "Project risk management using multiple criteria decision-making technique and decision tree analysis: a case study of Indian oil refinery," Production Planning & Control, vol. 23, no. 12, pp. 903-921, 2012.
  43. [43] B. Kloss-Grote and M. A. Moss, "How to measure the effectiveness of risk management in engineering design projects? Presentation of RMPASS: a new method for assessing risk management performance and the impact of knowledge management—including a few results," Research in Engineering Design, vol. 19, pp. 71-100, 2008.
  44. [44] K. Jayasudha and B. Vidivelli, "A Study on Risk Assessment in Construction Projects," International Journal of Modern Engineering Research, vol. 4, no. 9, pp. 20-23, 2016.
  45. [45] R. Bahamid and S. Doh, "A review of risk management process in construction projects of developing countries," IOP Conference Series: Materials Science and Engineering, vol. 271, p. 012042, 2017.
  46. [46] A. A. Hassanein and H. M. Afify, "A risk identification procedure for construction contracts—a case study of power station projects in Egypt," Civil Engineering and Environmental Systems, vol. 24, no. 1, pp. 3-14, 2007.
  47. [47] A. Rostami, "Tools and techniques in risk identification: A research within SMEs in the UK construction industry," Universal Journal of Management, vol. 4, no. 4, pp. 203-210, 2016.
  48. [48] M. Eller, J. Beck, and M. Hedrich, "A new sustainability controlling approach for urban water systems: multidimensional risk identification and system analysis," Journal of Environmental Science and Engineering-A, vol. 5, pp. 432-438 2016.
  49. [49] A. M. Burhan, "Risk management in construction projects," MSc Thesis, University of Baghdad, 2003.
  50. [50] Project Management Institute, A guide to the project management body of knowledge (PMBOK guide). Project Management Institute, Inc., 2017.
  51. [51] H. Sarvari, A. Valipour, N. Yahya, N. M. Noor, M. Beer, and N. Banaitiene, "Approaches to risk identification in public–private partnership projects: Malaysian private partners’ overview," Administrative Sciences, vol. 9, no. 1, p. 17, 2019.
  52. [52] L. Tchankova, "Risk identification–basic stage in risk management," Environmental Management and Health, vol. 13, no. 3, pp. 290-297, 2002.
  53. [53] Z. Kuang, "Risk Management in Construction Projects: Application of Risk Management in Construction Period," Bachelor of Architectural Technology and Construction Management. Via University College, Horsens Campus, Denmark, 2011.
  54. [54] A. Lester, Project management, planning and control: managing engineering, construction and manufacturing projects to PMI, APM and BSI standards. Elsevier, 2006.
  55. [55] H. Yuan, J. Yu, and K. Peng, "Risk identification of electronic commerce project based on cloud-control," in 2007 International Conference on Wireless Communications, Networking and Mobile Computing, Shanghai, China, 2007: IEEE, pp. 3653-3656.
  56. [56] O. O. Odimabo, C. F. Oduoza, and S. Suresh, "An insight into the process, tools and techniques for construction risk management," in Risk Management Treatise for Engineering Practitioners: BoD, 2018, pp. 3-24.
  57. [57] R. J. Chapman, "The controlling influences on effective risk identification and assessment for construction design management," International Journal of Project Management, vol. 19, no. 3, pp. 147-160, 2001.
  58. [58] L. Su, "WBS-based risk identification for the whole process of real estate project and countermeasures," in 2012 National Conference on Information Technology and Computer Science, 2012: Atlantis Press, pp. 72-75.
  59. [59] R. Soofifard, M. Ebrahimi, and M. K. Bafruei, "Risk assessment of construction projects by using combined model of analytical network process and DEMATEL method," International Journal of Services and Operations Management, vol. 28, no. 1, pp. 1-25, 2017.
  60. [60] Project Management Institute, A Guide to the Project Management Body of Knowledge (PMBOK® Guide). ANSI, 2013. [61] Clear Risk, "Risk Identification Method-12 Types," 2016. [Online]. Available: https://manager.clearrisk.com/Resources/RiskTool/Risk_Identification_Methods_-_12_Types
  61. [62] D. Valis and M. Koucky, "Selected overview of risk assessment techniques," Problemy Eksploatacji, vol. 4, pp. 19-32, 2009.
  62. [63] M. R. Altaie, M. M. Dishar, and I. F. Muhsin, "Fundamental challenges and management opportunities in post disaster reconstruction project," Civil Engineering Journal, vol. 9, no. 9, pp. 2161-2174, 2023.
  63. [64] D. Hillmer, A. J. La Salle, L. Medsker, and G. Welsh, "A risk-identification tool for managers planning expert system applications," Expert Systems with Applications, vol. 4, no. 2, pp. 247-257, 1992.
  64. [65] J. F. Al-Bahar and K. C. Crandall, "Systematic risk management approach for construction projects," Journal of Construction Engineering and Management, vol. 116, no. 3, pp. 533-546, 1990.
  65. [66] M. F. Hasan and S. R. Mohammed, "Factors affecting time and cost trade-off in multiple construction projects," Archives of Civil Engineering, vol. 68, no. 2, pp. 549--561, 2022.
  66. [67] Y. Y. Haimes, J. Lambert, D. Li, R. Schooff, and V. Tulsiani, "Hierarchical holographic modeling for risk identification in complex systems," in 1995 IEEE International Conference on Systems, Man and Cybernetics, Intelligent Systems for the 21st Century, Vancouver, BC, Canada, 1995: IEEE, pp. 1027-1032.
  67. [68] M. De la Cruz, "An integrated methodology for response and control to risks and opportunities in construction projects," Doctoral Thesis, Technical University of Madrid, Spain, 1998.
  68. [69] G. Ahmad and D. Liu, "A Qualitative Approach for Software Project Risk Identification by KeyGraph," Research Periodical of University Press, vol. 2, no. 1, pp. 1-3, 2007.
  69. [70] Y. Yang, J. Sun, and L. Tang, "Research on the model of risk identification of container logistics outsourcing based factor analysis," in 2008 IEEE International Conference on Service Operations and Logistics, and Informatics, Beijing, China, 2008: IEEE, pp. 1680-1685.
  70. [71] S. Mojtahedi, S. Mousavi, and A. Aminian, "Fuzzy group decision making: A case using FTOPSIS in mega project risk identification and analysis concurrently," in 2008 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, 2008: IEEE, pp. 1769-1773.
  71. [72] M. M. Dishar, M. R. Altaie, and A. A. Abbood, "A Review Study to Extract the Reasons Leading to Cost Increase in Construction Projects: A Review Study to Extract the Reasons Leading to Cost Increase in Construction Projects," Samarra Journal of Engineering Science and Research, vol. 2, no. 3, pp. 187-206, 2024.
  72. [73] F. Giannini, M. Monti, S. Ansaldi, and P. Bragatto, "Hazard Identification in process plant through CAD, CAE and PDM systems," in Advances in Safety and Reliability-Proceedings of the European Safety and Reliability Conference, 2005, pp. 669-675.
  73. [74] J. Xu, Z. Liu, Y. Li, and X. Wang, "Risk identification of logistics outsourcing based on interface management," in International Conference on Transportation Engineering 2007, 2007, pp. 2199-2204.
  74. [75] C. Denger, M. Trapp, and P. Liggesmeyer, "SafeSpection–A systematic customization approach for software hazard identification," in Computer Safety, Reliability, and Security, Newcastle, UK, 2008: Springer, pp. 44-57.
  75. [76] Y. Bugayenko, "Competitive risk identification method for distributed teams," in Software Engineering Approaches for Offshore and Outsourced Development, Zurich, Switzerland, 2009: Springer, pp. 96-101.
  76. [77] I. Hogganvik and K. Stølen, "A graphical approach to risk identification, motivated by empirical investigations," in International Conference on Model Driven Engineering Languages and Systems, 2006: Springer, pp. 574-588.
  77. [78] D. Neiger, K. Rotaru, and L. Churilov, "Supply chain risk identification with value-focused process engineering," Journal of Operations Management, vol. 27, no. 2, pp. 154-168, 2009.
  78. [79] P. Narang and T. S. Abdelhamid, "Quantifying workers’ hazard identification ability using fuzzy signal detection theory," in Annual Conference of the International Group for Lean Construction (IGLC), 2006, pp. 497-509.
  79. [80] G. Shengping and W. Bing, "The ANP model for dam risk identification of the hydropower project," in 2010 Asia-Pacific Power and Energy Engineering Conference, 2010.
  80. [81] Y.-p. Li, W. Wang, and X.-m. Leng, "A Hierarchy Gap Method (HGM) for risk identification," in 2010 IEEE 17Th International Conference on Industrial Engineering and Engineering Management, Xiamen, China, 2010: IEEE, pp. 995-999. [82] S. Ebrahimnejad, S. M. Mousavi, and H. Seyrafianpour, "Risk identification and assessment for build–operate–transfer projects: A fuzzy multi attribute decision making model," Expert Systems with Applications, vol. 37, no. 1, pp. 575-586, 2010.
  81. [83] J. Sääskilahti and M. Särelä, "Risk analysis of host identity protocol: using risk Identification Method based on Value Chain Dynamics Toolkit," in Proceedings of the Fourth European Conference on Software Architecture: Companion Volume, Copenhagen, Denmark, 2010.
  82. [84] H. Cheng, S. Jiang, and D. Zou, "Risk identification of public infrastructure projects based on VFPE," in 2010 The 2nd International Conference on Computer and Automation Engineering (ICCAE), Singapore, 2010: IEEE, pp. 173-176.
  83. [85] M. E. Hassall, P. M. Sanderson, N. Cross, K. James, and I. T. Cameron, "Human Factors Hazard Identification: Industrial Testing of the Humhid Technique and Tool," Proceedings of the Human Factors and Ergonomics Society Annual Meeting, vol. 55, no. 1, pp. 2054-2058, 2011.
  84. [86] J. Wu et al., "Hazard Identification of the Offshore Three-Phase Separation Process Based on Multilevel Flow Modeling and HAZOP," in Recent Trends in Applied Artificial Intelligence, 2013: Springer Berlin Heidelberg, pp. 421-430.
  85. [87] C. King Chun, H. Li, and M. Skitmore, "The use of virtual prototyping for hazard identification in the early design stage," Construction Innovation, vol. 12, no. 1, pp. 29-42, 2012.
  86. [88] M. N. Ahmed and S. R. Mohammed, "Developing a Risk Management Framework in Construction Project Based on Agile Management Approach " Civil Engineering Journal, vol. 5, no. 3, pp. 608-615, 2019.
  87. [89] Y. Juan, Liu, H., & Xiao, F., "Supply chain hazards identification and a three-dimensional risk matrix model for food safety," RISTI (Revista Iberica de Sistemas e Tecnologias de Informacao), pp. 420-433, 2016.
  88. [90] Y. Imanara, D. Nakajima, M. Samejima, M. Akiyoshi, and H. Morihisa, "An identification method of risks in project plan document by automatic acquisition of risk expression," in 2012 IEEE International Conference on Systems, Man, and Cybernetics (SMC), Seoul, Korea (South), 2012: IEEE, pp. 1235-1239.
  89. [91] A. Alvand, S. M. Mirhosseini, M. Ehsanifar, E. Zeighami, and A. Mohammadi, "Identification and assessment of risk in construction projects using the integrated FMEA-SWARA-WASPAS model under fuzzy environment: a case study of a construction project in Iran," International Journal of Construction Management, vol. 23, no. 3, pp. 392-404, 2023.